Harvey Cleanup and Repair

Our city seems to be slowly recovering but there are many who are still displaced and wondering where they will go next. On the other hand some of us are using this time to do some much needed repairs.
I have some property out of town which used to house my sewing machine business, now it houses my bee hive and bee equipment plus a lot of my sewing/fabric playtoys including Vivian my Gamill.
Yesterday husband repaired the front eave on the porch. Just tearing down the eave which was hanging by one end and prompted a passerby to leave me a sign saying that he bought dilapidated houses made it look much improved., Replacling the rotten boards–probably because of clogging up of the drain spout from the cedar tree that lived there until Rita. Guess I should clarify–that was Hurricane Rita–followed by Humberto and then Ike in this area, not to mention tropical storm Allison and other assorted near storms with downpours of up to ten inches of rain in a day.
We had already repaired the shed roof–which houses the bee equipment; ran the lawn mower around, I picked up a lot of dead branches, and we checked on the bees. I am down to just one hive now–and there is an abundance of ants. The oil trap seems to be working well with a few hive beetles and a lot of ants.
While he worked on that eave, I worked on this community service quilt. I must confess I am accustomed to my own piecing–which–not to brag–well, okay bragging some–does not have ruffly edges. This top was beautifully pieced in the center but the borders were too long and so it ruffled. To compound the problem, the backing was just barely big enough. When I trimmed it afterward, I had mere slivers of backing to remove. It may have been my inexperience as a longarm quilter but it was definitely a challenge.
And yes, that is my attempt at free-form feathers. I think I need to stick to pantographs.
Now back to my own work–I still have a backlog to complete.